Start with your site. We check it, site your Clever Living home on it, and assemble the complete PIM application — prepared with Ibex Design and lodged with your council the same business day.
Enter your address. We pull the parcel and legal description from LINZ, the wind, earthquake and exposure zones from national hazard mapping, and the zoning rules from your district plan — instantly.
Items marked included are generated by Day One and included in today's PIM pack automatically.
Items marked arranged are site-specific design work coordinated by Ibex Design during the PIM processing window — so the building consent application is complete the day the PIM comes back.
Nothing for you to chase. It's all sequenced from this one submission.
Ibex Design certification for the standard plan set is generated automatically with your application — one site, one certificate, verifiable by reference. It travels with your consent documents; nothing for you to arrange.
Every Truss House application in the network — from first submission to consented, with the PIM window working for you the whole way.
| Job | Builder | Site | District | Model | Lodged | Status |
|---|
Certified Clever Living homes across the builder network — every application documented, lodged same-day and fully recorded.
Every application passes through the envelope gate and Ibex vetting. This is the throughput, the flagged work, and the fee pipeline it generates — none of it visible to the network.
| Builder | Applications | In envelope | Flags raised | Triggered work | Behaviour |
|---|
The client and builder never handle the memorandum — it's generated at vetting, uniquely referenced to one site, filed against the job, and attached to the lodgement. This is the latest certificate issued:
No certificate issued this session yet — run an application through the wizard and submit it.
The PIM application plans have been generated with all site data included.
⬇ Download the application plansWhile the PIM is with council, confirm how the site connects. This shapes the drainage design and what the drainlayer prices.
Start with the address — the process walks you through site, home, siting and lodgement one step at a time.
| Reference | Client | Site | Home | Record of Title | Status | Documents |
|---|---|---|---|---|---|---|
| Loading… | ||||||
A current Record of Title (ordered from LINZ, $8) must be uploaded against each application — plans must match the registered owner exactly, including trusts and companies.
| Name | Company | Phone | Type | ||
|---|---|---|---|---|---|
| Loading… | |||||
| Name | Company | LBP | Role | Status | ||
|---|---|---|---|---|---|---|
| Loading… | ||||||
Hand a code to a builder you've already vetted — they register with it and are approved instantly, no waiting.
| Code | Type | Status |
|---|---|---|
| Loading… | ||
| Job | Ref | Builder | Client | Site | Status |
|---|---|---|---|---|---|
| Loading… | |||||
| Builder | Applications |
|---|---|
| Loading… | |